Vietsovpetro installs wellhead platform topside at Bach Ho oil field
The Vietnam – Russia oil and gas joint venture Vietsovpetro on September 10 completed the installation of the wellhead platform topside block of the BK-23 drilling rig at Lot 09.1 of Bach Ho oil field, 145 kilometres to the southeast of Vung Tau city.