A medical waste treatment project was inaugurated and put into operation on Nov. 20 at the Cam Le district Healthcare Centre, in the central city of Da Nang.
The project, constructed with 84,583 USD in non-refundable Japanese government aid, is designed to have a treatment capacity of 200-300 kg of medical waste per day.
The project includes an incinerator and two sterilizers./.
The project, constructed with 84,583 USD in non-refundable Japanese government aid, is designed to have a treatment capacity of 200-300 kg of medical waste per day.
The project includes an incinerator and two sterilizers./.