The Quang Ninh Electricity Company is carrying out the installation of solar panels for 15 households residing on Tran island, Thanh Lan commune, Co To Island district, the northern province of Quang Ninh.
Prime Minister Nguyen Xuan Phuc worked with authorities of the Mekong Delta province of Bac Lieu in Ho Chi Minh City on January 12 to evaluate its socio-economic performance and discuss a number of major projects in the locality.
Vietnam has been urged to reduce its use of coal-fired energy and develop renewable energy to proactively respond to climate change and ensure energy security, heard a panel discussion of the Vietnam Economic Forum 2019 in Hanoi on January 17.
Micro Dragon, a satellite made by Vietnamese engineers, was launched into space at 9:50 (Japanese time) on January 18 by Japan Aerospace Exploration Agency (JAXA)
Vietnam’s solar power plants are facing a crisis in consumption of their electricity because there has not been synchronous development of power transmission infrastructure or a suitable operation mechanism.
BP Solar 1 solar power plant in the south central province of Ninh Thuan was inaugurated on January 20, becoming the first Vietnamese constructed project to get connected to the national grid so far.