Hanoi builds another inner-city flyover

The Hanoi People’s Committee on May 29 held a ceremony to kick off construction of a flyover connecting O Dong Mac and Nguyen Khoai.
Hanoi builds another inner-city flyover ảnh 1 At the ground-breaking ceremony (Photo:VNA)


Hanoi  (VNA)
– The Hanoi People’s Committee on May 29 held a ceremony to kick off construction of a flyover connecting O Dong Mac and Nguyen Khoai with a view to easing traffic congestion on the Ring Road 1 while ensuring traffic flow for vehicles from Tran Khat Chan street to Nguyen Khoai dyke.

According to Vu Van Vien, Director of the municipal Department of Transport, the steel flyover, with a length of 232 metres and width of 12 metres, will be built at a total cost of 168 billion VND (7.5 million USD).

Speaking at the ground-breaking ceremony, Chairman of the municipal People’s Committee Nguyen Duc Chung hailed efforts made by relevant units in completing procedures to start work on the flyover, making contributions to reducing traffic jam in one of the most important roads in the city.

He asked the units to speed up the construction and ensure safety and quality, adding that the construction department needs to continue studying measures to assure traffic flow on the Ring Road 1 and other roads in the city.

Earlier. Hoang Minh Giam-Nguyen Chanh flyover, the capital city’s eighth steel flyover, was opened to traffic after five years of construction.

It spans a length of 595.7 metres with two nine-metre lanes, allowing vehicles to run at speeds of up to 40km per hour.-VNA

VNA

See more

Hanoi has over 1,100 libraries and numerous cultural and educational spaces in the community. (Photo: VNA)

Spreading value of books, building foundations of learning society

Each weekend in Hanoi, the “Reading with Children” Club brings together students to practise reading, explore language, and express ideas creatively. According to founder of the club Nguyen Thuy Anh, the club encourages children to reflect, retell stories, and connect books with personal experiences, making reading more vivid and meaningful.

Automated ticketing system is used on the urban railway Cat Linh-Ha Dong line in Hanoi. (Photo: VNA)

Digital transformation powers Hanoi metro expansion

Beyond convenience, stable fares and the elimination of fuel, parking and maintenance costs have made urban rail increasingly attractive. The growing preference for metro travel is also contributing to a greener, more modern urban lifestyle.

Delegates cut the ribbon to inaugurate the operation of electric bus route No. 43. (Photo: VNA)

Hanoi accelerates shift to green buses, targets 100% by 2030

In the 2027–2030 period, the city will accelerate the transition towards the complete phase-out of fossil fuel-powered buses. The share of electric and green energy-fueled buses is projected to reach 79–89% by 2029 and 100% by 2030.

At the second session of the Ho Chi Minh City People’s Council (Photo: VNA)

Ho Chi Minh City greenlights central square, administrative centre in Thu Thiem

The new central city square and administrative centre will create a modern, centralised political-administrative complex for Ho Chi Minh City, designed to house around 8,000 officials, civil servants, and employees. It will also handle daily traffic of 1,500- 2,000 citizens and business representatives through a unified one-stop-shop administrative service system.

A working session at the job fair (Photo: VNA)

Vietnamese students flock to Seoul Job Fair 2026

The second annual Job Fair 2026 was held for Vietnamese students in the Republic of Korea. Organisers pitched it as a straight-up bridge between eager students and bosses hungry for young talent who can actually handle multicultural workplaces.

Defendants at the court (Photo: VNA)

Ho Chi Minh City court opens trial over Agribank lending scandal

The investigation revealed that multiple credit files were incomplete or riddled with inaccurate information, while some pledged assets lacked proper legal standing yet were accepted and grossly overvalued. As a result, the loans became high-risk and largely unrecoverable, leading to losses surpassing 1 trillion VND.

Hanoi introduces 53 electric buses from April 18 (Photo: VNA)

Hanoi to add 53 electric buses from April 18

According to the plan, all buses operating within Ring Road 1 will use green energy by July 1, 2026. The requirement will expand to Ring Road 2 by January 1, 2028, and to Ring Road 3 by 2030.

Illustrative image (Photo: VNA)

National, local traffic safety committees to be dissolved from June 1

Under the dicision, ministries and ministerial-level agencies will assume responsibility for tasks previously performed by the committee, in line with their mandates under the Law on Government Organisation, the Law on Road Traffic Order and Safety, the Law on Roads and other relevant legal frameworks, ensuring that traffic safety and order are maintained without disrupiton.