Hanoi watches quarantined citizens with smartphone app

Hanoi has activated a smartphone app that allows the authorities to keep check on quarantined patients and lets the patients themselves update health information.
Hanoi watches quarantined citizens with smartphone app ảnh 1A smartphone user checks the new app Hanoi SmartCity (Photo:VNA)

Hanoi (VNA) - Hanoi has activated a smartphone app that allows theauthorities to keep track of people in quarantine and enables them to update health information.

It also shows the public where about in the city people who have testedpositive, or came into contact with positive patients, were staying.

Details of Hanoi SmartCity were revealed on March 18 by Nguyen Duc Chung,Chairman of the People’s Committee of Hanoi.

It aims to provide local people information about the COVID-19 pandemic, a mapof tracking the spread of the virus in the city as well as supervise infectedand quarantined citizens.

The app enables monitoring both infected people and those who are required tobe quarantined via GPS system.

The app was designed by the city’s Informatics Centre and the city’s Centre forDisease Control. To download the app, people have to search for the keyword “HanoiSmartCity” on the Google Play Store or App Store and then install it on thedevice.

The app has two sections, one for the people and another for the Government.Currently, the whole list of quarantined people has been updated to the system.

People, who are required to be quarantined, will register and create an accountby their smartphone and identity card.

After the system synchronises data, it will notify the app user to turn on GPSfor monitoring.

People can use the integrated functions to report daily health information,keep track of information about the pandemic developments provided by the cityauthority and discuss with the local health authorities via the app.

Local administration will be provided a map to monitor the entire distributionof outbreaks in the city. When a quarantined or infected person on the mapleaves the location, immediately the person in charge of supervision willreceive a notification message to know how far the quarantined or infectedperson is./.
VNA

See more

A bridge crossing the Huong River in Hue city is set to open to traffic (Photo: internet)

Major projects to be launched in Hue city

The city has set a 2025 GDP growth target of at least 10% and is prioritising investment-friendly policies, infrastructure development, and accelerated project implementation.

A new house built for a poor household in Thai Binh (Photo: VNA)

Thai Binh aims to eradicate substandard housing ahead of schedule

Thai Binh province has identified 2,106 eligible households—1,164 requiring new homes and 942 needing home repairs. Each new house receives 100 million VND in aid, while 50 million VND is provided for each repaired home. The total budget for the 2024-2025 period is 163.5 billion VND (6.4 million USD).

CEO of Asahi Corporation Katsu Tsunoda speaks at the 2025 graduation ceremony for international students studying in Japan. (Photo: VNA)

Vietnamese students honoured at Asahi scholarship graduation ceremony in Japan

Vietnamese students achieved remarkable successes, excelling in various categories. Seven out of 22 students passed the N1 level of the Japanese Language Proficiency Test - the highest level - while 16 out of 34 students received the special award. Notably, some Vietnamese students were recognised for outstanding achievements in all three award categories.

Illustrative image (Photo: VNA)

Ninh Thuan ramps up efforts to eradicate substandard housing

Ninh Thuan will intensify awareness campaigns and launch a 90-day push from April to June 2025 to mobilise further resources. By adopting a flexible approach in utilising funds, the province is determined to achieve its goal of ensuring safe and stable housing for all vulnerable residents./.

A new house has been built for needy households (Photo: VNA)

Tien Giang steps up efforts to eliminate substandard houses

According to the Tien Giang People’s Committee, 485 homes for policy beneficiaries, families of war martyrs, and low-income households will be supported. Of these, 284 new homes will be built, and 201 existing ones repaired, with a total budget of 24.1 billion VND (about 984,000 USD). As of March 6, construction had started on 166 houses, with 32 already completed.