PetroVietnam proposes adding power plants to national grid

The Vietnam National Oil and Gas Group, or PetroVietnam, has proposed to add the construction of the Nhon Trach 3 and 4 thermal power plants to plans for national electricity development.
PetroVietnam proposes adding power plants to national grid ảnh 1Illustrative photo (Photo: VNA)

Hanoi (VNA) - The Vietnam National Oil and Gas Group, or PetroVietnam, has proposed to add the construction of the Nhon Trach 3 and 4 thermal power plants to plans for national electricity development. 

This was reported by the Ministry of Industry and Trade. 

According to the proposal, the two power plants, each with the production capacity of 750-800 MW, are designed to be constructed on the total area of some 34ha in the Ong Keo Industrial Park in Nhon Trach district in the southern province of Dong Nai. 

The Nhon Trach 3 power plant will occupy nearly 16.6ha, while the second power plant will be spread over an area of 17.4ha (excluding the complex area, surface water and public service buildings). 

Following PetroVietnam’s proposal, the Ministry of Natural Resources and Environment has requested the oil group to make a supplementary report on the compatibility of the power plant construction with the development plan of the Ong Keo IP and with land use zoning and planning of the locality approved by the competent authority. 

The ministry also said construction must comply with water resource legislation. 

The oil and gas group must prepare an updated report on the current state of water exploitation and use of the Nhon Trach Power Centre and calculate the water demand of the power plants and supply capacity of the water resource. 

The group is also required to make an additional plan for prevention and control of pollution, degradation and depletion of water resources during construction. 

As the project is located at the confluence of Dong Tranh and Long Tau in the Dong Nai river system, construction activities must comply with the law on the water resources protection corridor. The two power plants are required to build a centre for collection and sewage treatment. 

In addition, PetroVietnam will have to report the current state of the air and water environment in the construction area. If its proposal is approved, the oil group is requested to provide an environmental impact assessment report to the competent authority for approval. 

Earlier, the Ministry of Industry and Trade finalised the investment plan for Nhon Trach 3 and 4 plants as part of efforts to deal with power shortage after 2020, especially in the southern region. 

PetroVietnam’s Nhon Trach 2 plant began commercial operation in 2011 with the capacity of 750 MW and productivity of 5.5 billion kWh per year. The 450KW Nhon Trach 1 plant, which began operation in 2008, generates 2.5 billion kWh per year.-VNA

VNA

See more

Illustrative image (Photo: VNA)

Police seek victims in Australian-Vietnamese fraud probe

Ranjit Thambyrajah, a 65-year-old Australian who heads Berhero company operating under the name Acuity Funding based in Australia, while serving as General Director of Nam Song Hau Petroleum Trading and Investment JSC; and Nguyen Viet Anh, 43, a dual Vietnamese-Australian national running Acuity Funding Vietnam and Deputy General Director of the same Vietnamese company, allegedly defrauded multiple businesses and individuals.

At a mobilse trial in Song Doc commune, Ca Mau province on November 12. (Photo: VNA)

Ca Mau holds mobile trials related to IUU fishing violations

The People’s Court of Ca Mau province held two mobile trials in Song Doc commune on November 12, tackling cases of related to the organisation of illegal exit and the unlawful cross-border transport of goods, both linked to illegal, unreported and unregulated (IUU) fishing activities.

Prime Minister Pham Minh Chinh urges localities in the central region to assess storm and flood damage and expedite recovery efforts. (Photo: VNA)

PM urges swift storm damage assessment, recovery in central region

The PM also directed localities to identify their needs for crop and livestock varieties and other essential materials for agricultural recovery, and to report to the Ministry of Agriculture and Environment (MAE) prior to November 15 for prompt coordination and support.

St Petersburg Governor Alexander Beglov (left) presents the badge to Dr Nguyen Quoc Hung, Vice President of the Union of Vietnamese Organisations in Russia and Director of the “Tradition and Friendship” Fund (Photo: VNA)

Vietnamese individual honoured for contributions to St Petersburg

The badge is a personal reward but also reflects the St Petersburg Committee for External Relations and the city administration's appreciation of the efforts by the “Tradition and Friendship” Fund of the Vietnamese community in Russia in fostering people-to-people diplomacy as well as mutually beneficial cooperation between St Petersburg and Vietnamese localities.

The Ho Chi Minh City delegation presents assistance to low-income households in Phu Xuan ward of Hue city. (Photo: VNA)

HCM City provides 800,000 USD to help Hue recover from floods

Vice Chairman of the Hue municipal People's Committee Nguyen Chi Tai thanked Ho Chi Minh City for its timely support and pledged to allocate the funds efficiently and transparently to families most affected by the disaster. He expressed his hope that the strong bond between the two cities would continue to grow, spreading the values of solidarity and mutual support for sustainable development.

VASEA President Professor Nghiem Duc Long (second, left) presents a token donation for flood-affected compatriots to Nguyen Thanh Tung, Vietnamese Consul General in Sydney. (Photo: VNA)

Vietnamese community in Australia supports flood victims back home

The charity, registered with the Australian Charities and Not-for-profits Commission (ACNC), launched the campaign after Vietnam was struck by two severe typhoons, Bualoi and Matmo, in late September 2025, causing widespread damage across northern and central provinces.

PM Pham Minh Chinh speaks at the meeting (Photo: VNA)

PM demands tighter rules for social housing push

Social housing projects require full infrastructure, from roads, utilities and telecom systems, to clinics, schools and recreation facilities, while equal access must extend nationwide, said PM Pham Minh Chinh.

Vinh Long currently has 4,628 registered fishing vessels, 4,450 of which are licenced for fishing, accounting for 96.2%. (Illustrative image: VNA)

Vinh Long promotes fishermen’s compliance with IUU rules

Vinh Long currently has 4,628 registered fishing vessels, 4,450 of which are licenced for fishing, accounting for 96.2%. Since early this year, no local vessels have violated foreign waters or been detained by foreign authorities.