Vietsovpetro, a joint Vietnamese-Russian enterprise for oil and gas exploration, has set out its goal to complete the installation work of Tho Trang 01 (White Rabbit 01) oil rig 15 days ahead of schedule in July.
The Trade Union of the Vietsovpetro joint venture on May 11 launched a contest in central Ba Ria – Vung Tau province for an earlier operation of the platform which was previously scheduled on July 15.
Located 7.5km away from the Bach Ho (White Tiger) oil field to the northeast in lot 09-1, the 3,200-tonne platform is expected to yield 700,000 tonnes of oil per day. The output would help the joint venture fulfill its plan to tap 5.4 million tonnes of oil this year.
Tho Trang 01 is the newest among the fourth generation of its kind totally designed and installed by Vietsovpetro.
From 2006 until 2012, Vietsovpetro has successfully put into operation eight new generation oil rigs.-VNA
The Trade Union of the Vietsovpetro joint venture on May 11 launched a contest in central Ba Ria – Vung Tau province for an earlier operation of the platform which was previously scheduled on July 15.
Located 7.5km away from the Bach Ho (White Tiger) oil field to the northeast in lot 09-1, the 3,200-tonne platform is expected to yield 700,000 tonnes of oil per day. The output would help the joint venture fulfill its plan to tap 5.4 million tonnes of oil this year.
Tho Trang 01 is the newest among the fourth generation of its kind totally designed and installed by Vietsovpetro.
From 2006 until 2012, Vietsovpetro has successfully put into operation eight new generation oil rigs.-VNA