Work accelerated for HCM City’s first metro line

Ho Chi Minh City’s Metro No.1 project will receive strong support from local authorities so that it can soon be put into operation, Secretary of the municipal Party Committee Nguyen Thien Nhan on March 13 stressed.
Work accelerated for HCM City’s first metro line ảnh 1Officials of HCM City inspect the construction sit of the metro No. 1 project on March 13 (Photo: VNA)

HCMCity (VNA) – Ho Chi Minh City’s Metro No.1 project will receivestrong support from local authorities so that it can soon be put intooperation, Secretary of the municipal Party Committee Nguyen Thien Nhan onMarch 13 stressed.

Inspecting the work, Nhan highlighted the significance of the 19.7 km BenThanh-Suoi Tien line, which travels through District 1, Binh Thanh, District 2,Thu Duc, District 9, and ending in Binh Duong province. He explained that itwill lay the foundation for the following metro lines and make significantcontributions to completing the city’s comprehensive transport system plans.

This is one of the eight metro linesof the HCM City Metro project, managed by the city’s Management Authority forUrban Railways.

The project includes four major bidding packagesusing official development assistance and funds from the Japan InternationalCooperation Agency (JICA).

It was first proposed in 2001 as part of acomprehensive public transport plan for the city and neighbouring provinces tomitigate traffic congestion.

Project adjustments were approved in August 2011,following three increases to the total investment from 14.4 trillion VND (623.2million USD) to reach more than 47.3 trillion VND (2.1 billion USD).

The municipal People’s Committee said that thecity has signed three loan agreements worth 31.2 trillion VND.

By now, 62.5 percent of the work has beencompleted. 

According to Bui Xuan Cuong, head of the city’s Management Authority of UrbanRailways, some 1,400 engineers and workers are working on the Metro No.1project, with completion of 80 percent of the workload achievable this year.

Underthe Government’s Decision No.568/QD-TTg dated April 8, 2013 on the adjustmentof HCM City’s transport system by 2020 and a post-2020 vision, the city’srailway system will include eight metro lines as well as three tramways ormonorail lines with a total length of around 220 km. Total investment for thecity’s urban railway is projected at nearly 250 billion USD. –VNA  
VNA

See more

Petrovsky Palace in Moscow shines in the golden hues of autumn. (Photo: VNA)

Russia waives visa requirements for Vietnamese tourists

According to a notice published on the official website of Russia’s Ministry of Justice, Vietnamese citizens can now stay in Russia for up to 30 consecutive days, provided their purpose of travel is not employment.

Students from the VACEO art class perform at the Cultural Fusion - Narellan festival. (Photo: VNA)

Vietnamese in Australia keep heritage alive

Vietnamese dance and traditional music classes organised by the Viet-Aus Culture Exchange Organisation (VACEO) have been held every Saturday afternoon in Bankstown, Sydney.

Load testing of the 3,400-tonne main arch structure and supporting frame of the Saigon River pedestrian bridge at the factory (Photo published by VNA)

Saigon River pedestrian bridge set to be joined on October 21

The assembly comprises a main bridge structure weighing about 1,400 tonnes and a specialised steel supporting frame weighing around 2,000 tonnes. During testing, about 30 self-propelled modular transporters were used to lift the assembly 40cm off the ground for technical inspections. Sensors and monitoring equipment recorded key parameters.

Ba Vi Safari Park. (Photo: Sun Group)

Hanoi breaks ground on 299-hectare safari park

Its key features will include animal habitats modelled on natural ecosystems, veterinary and research facilities, educational exhibitions and recreational areas. Green spaces and water bodies will cover about 81.8% of the site, providing ecological corridors and suitable habitats for wildlife.

Bac Ninh launches iBacninh, a digital communication platform connecting local authorities with citizens and businesses. (Photo: VNA)

Bac Ninh launches iBacninh app to drive data-led governance

Speaking at a conference and exhibition marking National Digital Transformation Day 2026, held on October 9, Vice Chairman of the municipal People’s Committee Dao Thanh Truong stressed that digital transformation should be measured by governance efficiency, officials’ productivity and the quality of services provided to citizens and businesses.

Deputy Prime Minister Le Tien Chau addresses the meeting (Photo: VNA)

Deputy PM asks for highest education quality, safety for students

Regarding the construction of inter-level boarding schools in border communes, all 108 schools under Phase 1 opened for the 2026-2027 academic year, with 40 having completed all construction items. Procedures for groundbreaking at 121 schools under Phase 2 across 17 provinces and cities have been completed, with all projects targeted for completion before August 30, 2027.