Under the 65 million USD contract, VSP, a joint venturebetween PetroVietnam and Zarubezhneft of Russia, will design structures, procurenecessary materials and undertake construction and transportation of the WHP-DH2oil-rig off the country’s southern coast.
The oil rig, which is expectedto turn out the first oil on September 2, 2011, is expected to pump 18,000barrels per day.
Besides WHP-DH2, the contract also includes theupgrading of the FPU-DH1 oil-rig, also in the oil-field./.