According to planning, the first and second floors will be used for Metro Line No 1, with the third and fourth floors expected to serve other lines as they are built and opened.
A train stop system at the station comprises two parallel railways. Each is 660 metres long and 1.4 metres wide.
The atrium together with the surrounding glass walls are expected to become popular “Instagrammable” spots for local people and visitors.
VNA