Renewable energy yet to meet potential: conference

The development of wind and solar power has not matched its great potential, especially in the central and southern regions, experts said at a recent conference.
Renewable energy yet to meet potential: conference ảnh 1Illustrative image (Photo: VNA)

HCMCity (VNA) – The development of wind and solar power has not matchedits great potential, especially in the central and southern regions, expertssaid at a recent conference.

Speakingat the conference on renewable energy and roof-top solar power held on July 9in HCM City, Deputy Minister of Industry and Trade Hoang Quoc Vuong pointed to manybarriers that have hindered solar and wind power development.

Infrastructurefor the energy transmission grid, for instance, has not kept pace withrenewable energy projects.

Asa result, several projects in Ninh Thuan and Binh Thuan cannot generate 100percent of capacity at certain time, the Deputy Minister said.

Roof-topsolar power also has high initial costs, and while products and servicesrelated to roof-top solar power are available, they have no specific technicalstandards. This has affected the interest of investors in such projects.

Vuongnoted that the Government has created preferential policies that offerfavourable conditions for investors to exploit the potential of renewableenergy for sustainable socio-economic development.

Theministry has also set up action programmes, which have been submitted to thePrime Minister for approval, that would be the legal basis for implementationof such projects, Vuong added.

Sincethe issuance of the governmental decision on preferential policies for solarpower development in April 2017, around 4,500 MW of power has been connected tothe grid.

Nearly500 MW of roof-top solar power and more than 400 MW of wind power systems areoperating. About 3,000 MW of solar power and 2,000 MW of wind power systems areunder construction and are expected to be operating by the end of this year.

Thesesolar and wind power systems will reduce pressure on the national electricitysystem and help set up a renewable energy market in the country, contributingto local socio-economic development, Deputy Minister Vuong said.

VoQuang Lam, deputy General Director of Vietnam Electricity (EVN), said thatenergy demand continues to grow. The demand in the 2016-20 period increased by0.3 percent to 11.3 percent per year. From 2021 to 2030, it is estimated to riseby 8 percent to 8.5 percent each year.

Accordingto the Electricity and Renewable Energy Authority, the country will lack 12,690MW of power by 2023.

Ashortage of power could occur in the southern region, with 3.7 billion kWh in2021, increasing to nearly 10 billion kWh in 2022 and 12 billion kWh in 2023./.

See more

Workers process agricultural products for export. (Photo: VNA)

Vietnam's small business growth soars to a four-year high

The survey findings released in Ho Chi Minh City on March 21 show that the growth momentum is expected to accelerate in 2025, with 92% of small businesses expecting to grow, the highest projection among 11 markets surveyed.

At the meeting between French Minister of Transport Philippe Tabarot and Vietnamese Minister of Construction Tran Hong Minh in Hanoi on March 21. (Photo: VNA)

French businesses show strong interest in Vietnam’s high-speed railway project: Minister

Minh also mentioned Vietnam’s ongoing construction of Long Thanh International Airport, which will have a total capacity of 100 million passengers per year upon completion. The airport is expected to become Vietnam’s largest and serve as an international gateway, offering new opportunities for global aviation businesses, including those from France, to expand their connections in Vietnam and ASEAN, he said.

The ground-breaking ceremony for the Hon La International Port on March 21 (Photo: VNA)

Quang Binh breaks ground on 90-million-USD international port

The port features comprehensive planning with modern warehouses, logistics areas, and technical facilities. Its strategic location in the sheltered Hon La bay, protected by Hon Co and Hon La islands, provides ideal natural depth for large vessels.

SMEs face many difficulties in accessing capital. (Photo: baokiemtoan.vn)

SMEs need support policies: insiders

With nearly one million businesses and around five million business households, the private sector contributes approximately 51% of the country's Gross Domestic Product (GDP) and over 30% to the State budget. However, most small and medium-sized enterprises (SMEs) face significant barriers in scaling up and enhancing their competitiveness.

Quang Ninh plans to develop four new industrial parks (Photo: VNA)

Quang Ninh to develop four new industrial parks

To attract investment for infrastructure development in these zones, the Quang Ninh provincial People's Committee is focusing on reviewing available land and making a list of projects to attract investors for technical infrastructure construction.

A Vietjet executive performs the ribbon-cutting ceremony for the Ho Chi Minh City - Bengaluru route launch. (Photo: baodautu.vn)

Vietnam’s leading airlines to open new routes to India

Vietnam's national flag carrier Vietnam Airlines plans to launch direct flights from Hanoi to Bengaluru and Hyderabad starting in May, while private carrier Vietjet has already commenced services connecting Ho Chi Minh City to these two major Indian hubs on March 18.

Inside a steel factory in northern Vietnam. Despite signs of recovery, the industry remains below 2021 production levels (Photo: VNA)

Steel sector faces challenges

Vietnam’s steel sector is grappling with mounting challenges, including a rising volume of Chinese steel exports, domestic oversupply and global trade barriers, experts warn.