The complex is being built on an area of over 6,000 sq.m andwill be equipped with modern production lines capable of producing 2million products per year such as 3G laptops and mobile phones./.

Lao Cai strives to build, repair nearly 3,500 houses for the needy by May
In the 2024-2025 period, the province planned to replace 11,024 substandard houses. So far, it has built and repaired 7,531 houses.