Le Van Luong-Ring Road 3 tunnel ready for operation

After 2 years of construction, the Le Van Luong tunnel is ready to open to traffic from tomorrow (October 5) and is expected to reduce traffic pressure on the streets of Le Van Luong and To Huu street as well as other nearby routes.

After 2 years of construction, the Le Van Luong tunnel is ready to open to traffic from tomorrow (October 5) and is expected to reduce traffic pressure on the streets of Le Van Luong and To Huu street as well as other nearby routes.

On the morning of October 4, most of the construction tasks of the Le Van Luong tunnel project have been completed.

The tunnel surface has been asphalted and painted with dividing lines. The system of traffic signs and lighting has been installed and a green landscape has been created.

The contractor is doing the final touches so the tunnel can be ready for the opening ceremony tomorrow morning./.

VNA