Binh Thuan asks for about 400 billion VND to build embankments

The south central province of Binh Thuan needs about 400 billion VND (16.7 million USD) to build embankments in areas hit by landslides and erosion, said Vice Chairman of the provincial People’s Committee Phan Van Dang.
Binh Thuan asks for about 400 billion VND to build embankments ảnh 1Delegates at the working session (Photo: https://baobinhthuan.com.vn/)

BinhThuan (VNA) – The south central province of Binh Thuan needs about400 billion VND (16.7 million USD) to build embankments in areas hit by landslides anderosion, said Vice Chairman of the provincialPeople’s Committee Phan Van Dang.

Speaking at a working session with a working delegation from the NationalSteering Committee for Natural Disaster Prevention and Control on August 15,Dang said that the province is facing serious coastal erosion that has affected residentialareas, economic zones, tourist areas and reservoirs.

Meanwhile, with current resources, the provincefinds it difficult to complete the works synchronously and in time.

Since the beginning of this year, the provincesuffered natural disasters such as tornadoes, lightning strikes, heavy rains, floods,landslides, and coastal erosion in localities ,including Bac Binh, Tuy Phong,and Phan Thiet.

The natural disasters claimed five lives and and31 injuries, forced 21 households to relocate. Heavy rain and strong winds caused 347houses to collapse, get unroofed, flooded, or damaged. More than 14,700 ha ofagricultural production area, 15 fishing cages and 36 ha of traditional fishfarming were damaged by rain and floods. The damage was estimated at more than 135billion VND.

In the first seven months of 2023, 63accidents and incidents occurred on the sea border area of the province,causing 15 deaths, nine missing, and six injured.

Deputy Minister of Culture, Sports and TourismTa Quang Dong, who led the working delegation to inspect natural disaster prevention and control in Binh Thuan province, highlyappreciated the results and efforts of the province in implementing proactivesolutions to prevent and control natural disasters, and conduct search and rescue andincident response at sea.

He said that in the coming time, the weather isforecasted to continue to be complicated, extreme and unpredictable, whichrequires Binh Thuan province to stay proactive in natural disaster preventionand control, and climate change adaptation.

The province needs to step up communication toraise awareness and skills in natural disaster prevention and control, searchand rescue in the community, he said, adding that the province must payattention to training and improving professional skills for rescue force,preparing forces, means, equipment and conditions to properly respond to incidents./.

VNA

See more

White-rumped langurs are rescued and conserved at the Endangered Primate Rescue Centre (EPRC) in Cuc Phuong National Park. (Photo: VNA)

Ninh Binh establishes Kim Bang white-rumped langur conservation area

Covering a total area of 3,182ha, the conservation area comprises 3,016.81ha of natural forest, 64.25ha of plantation forest and 100.94ha of land without forest, with no water surface area. It is located in the Ly Thuong Kiet, Tam Chuc and Nguyen Uy wards of Ninh Binh province.

The forum takes place in Hanoi on August 25, 2026. (Photo: VNA)

Vietnam, RoK promote cooperation to deliver on net-zero commitments

Sectors such as semiconductor manufacturing, nuclear power, science and advanced technologies are playing an increasingly important role in national competitiveness and economic development of each country. They also offer considerable room for Vietnam and the RoK to expand professional exchanges, share experience and promote cooperation, particularly among their energy experts.

Storm Narra's projected path as of 7:00 on August 22. (Photo: National Centre for Hydro-Meteorological Forecasting)

Storm brings heavy rains to northern Vietnam

Storm Narra, the fourth to hit the East Sea this year, brought strong winds and heavy rains to northern Vietnam on early August 22, with some areas forecast to receive more than 500mm of rain as the storm moves slowly over the northern waters of the East Sea.

A view of the meeting between Phu Tho authorities and a visiting delegation from Germany's KfW Development Bank in the province on August 20, 2026. (Photo: VNA)

Phu Tho, German bank discuss wastewater treatment plan for Da River's left bank

The project is being implemented in the former Hoa Binh city, now Hoa Binh ward. It has a total investment of 688.7 billion VND (26.38 million USD), including 507.3 billion VND in ODA and 181.4 billion VND in counterpart funding. Major components include a wastewater treatment plant, pumping stations, a collection network, and connection infrastructure.

Construction workers reinforce steel and pour concrete to cover the underground drainage channel, helping collect rainwater and tackle flooding in Da Nang. (Photo: VNA)

A new “shield” against climate change

Smart urban areas are no longer simply about technology; they are becoming a tool that enables authorities to forecast risks, adapt quickly and protect their residents.

Vietnam is exerting efforts to cope with climate change. (Illustrative photo: VNA)

Vietnam approves carbon credit pact with Singapore under Paris Agreement

Signed on September 16, 2025, the Implementation Agreement on carbon credits collaboration under Article 6 of the Paris Agreement on climate change affirms Vietnam and Singapore’s pioneering role and commitment to close cooperation in the international carbon market, making a substantive contribution to global climate response.

A view of Vo Cuong ward, Bac Ninh province (Photo: VNA)

Bac Ninh earmarks over 1.7 billion USD for environmental protection

By 2030, Bac Ninh aims to ensure that all operating industrial clusters and industrial parks have centralised wastewater treatment systems meeting standards, while at least 95% of wastewater in Grade-I urban areas and 70% in Grade-II urban areas is collected and treated to required standards.