Hanoi (VNA) – The People’s Committee of Hanoi on June 30 inaugurated a C-shaped flyover connecting Chua Boc and Pham Ngoc Thach streets.
The flyover is expected to help reduce long-lasting congestions at the Chua Boc-Pham Ngoc Thach-Ton That Tung-Dong Tac intersection.
It has two lanes for cars and motorbikes, with a total length of 318m and a width of 9m.
Construction on the overpass took place in 10 months, at a cost of 147 billion VND (6.2 million USD)./.
The flyover is expected to help reduce long-lasting congestions at the Chua Boc-Pham Ngoc Thach-Ton That Tung-Dong Tac intersection.
It has two lanes for cars and motorbikes, with a total length of 318m and a width of 9m.
Construction on the overpass took place in 10 months, at a cost of 147 billion VND (6.2 million USD)./.
VNA