Nearly 200 railway bridges at high risk

About 180 railway bridges across the country are in need of urgent repairs to ensure traffic safety, according to Vietnam Railways (VNR).
Nearly 200 railway bridges at high risk ảnh 1The pillars of Duong Bridge spanning the Duong River in Hanoi have been seriously damaged. (Photo: baotintuc.vn)

Hanoi (VNA) – About 180 railway bridges across the country are in need of urgent repairs to ensure traffic safety, according to Vietnam Railways (VNR).

Doan Duy Hoach, Deputy General Director of Vietnam Railways, said statistics from VNR showed that there were 1,920 railway bridges nationwide. Most of them have a long service life.

However, only 86 of the 180 bridges deemed weak were on the list of projects in need of upgrades. This has greatly affected the performance of VNR, he said.

Trains often had to reduce their speed or the loading capacity while crossing weak bridges, Hoach told Tin Tuc (News) newspaper.

The dilapidated bridges include Duong Bridge and Ho Bridge across the Duong River, Bac Giang Bridge across the Thuong River, Ninh Binh Bridge across the Day River and Quay Bridge across the Lach Tray River. These bridges were at risk of collapse because they were about 100 years old. Many of them were built during French colonial times and have suffered damage to their supporting pillars.

Those bridges were vulnerable to being struck by waterway vehicles, said Ta Quang Son, head of the technical office of Ha Hai Railway Joint Stock Company, which manages many weak railway bridges.

Tran Van Tho, Deputy Head of Vietnam Inland Waterways Administration, shared the same opinion.

He said old bridges that did not meet the requirements for waterway traffic should be upgraded or replaced. Priority should be given to Long Bien Bridge and Duong Bridge in Hanoi and Quay Bridge in the northern city of Hai Phong because these bridges did not meet clearance height requirements and their pillars did not undero preventative measures to protect the structures from collision.

To ensure traffic safety and smooth operations of the railway sector, Doan Duy Hoach said weak bridges should be regularly maintained or replaced.

He suggested that the Ministry of Transport should prioritise investment for repairs to 86 weak bridges, with top priority given to 44 bridges as part of a project on upgrading weak bridges along the Hanoi-HCM City railway route. It was necessary to upgrade 32 weak bridges on the Da Nang-Saigon section and standardise the loading capacities on the entire route, he said.

However, the ministry said a lack of capital was still a huge problem. State allocations for bridge maintenance only met about 40 percent of the required capital.

According to Deputy Minister of Transport Nguyen Hong Truong, authorities from railway, roads and waterway sectors should strengthen measures to restrict bridge load capacities and raise awareness among bridge users of traffic laws.

These sectors should review all the bridges, especially the ones facing high risks of waterway vehicle collision, and finalise warning systems for such vehicles, Truong said.-VNA

VNA

See more

Urban areas along Sai Gon River in Ho Chi Minh City. (Photo: qdnd.vn)

Awakening potential of Sai Gon River

HCM City is currently orienting itself towards developing a riverside urban area, making Sai Gon River a landscape-economic-ecological axis, connecting the city centre with Thu Duc city, District 7, Nha Be and Cu Chi districts, and the Southeast region.

A seminar about the rice cropping system and farming management in the Mekong Delta that took place on May 13 in Hanoi. (Photo: VNA)

Research findings support sustainable, low-emission rice farming

Leading domestic and international scientists exchanged views on how to use data gathered from a research project that surveyed 10,000 rice farmers across twelve Mekong Delta provinces between 2022 and 2024 – the largest household-level investigation that IRRI has conducted in 30 years.

An Giang has delivered 2,482 homes to the local residents. (Photo: VNA)

An Giang aims to do away with substandard houses

As of May 13, An Giang broke ground on 2,957 homes under this programme, including 2,453 new constructions and 465 renovations. The province has already completed and delivered 2,482 homes to residents. As much as 215.5 billion VND (8.3 million USD) has been mobilised for the efforts.

Promoting smart and sustainable agriculture is a top priority within Vietnam’s strategy for sustainable agricultural and rural development for the 2021–2030 period, with a vision to 2050. (Photo: VNA)

Vietnam, Austria boost cooperation in smart agriculture

During his visit to BOKU on May 14, the ambassador highlighted that promoting smart and sustainable agriculture is a top priority within Vietnam’s strategy for sustainable agricultural and rural development for the 2021–2030 period, with a vision to 2050.