Under the proposal, the two sections are to be built and becomeoperational before 2032 at a total cost of 375.87 trillion VND (15.7 billionUSD), or before 2030 with total investment of 561.59 trillion VND (23.3 billionUSD).
The transport sector plans to build seven new railway routes in the2021-2030 period and upgrade a number of old lines./.
