Severe floods disrupt North – South rail services in south-central region

In Khanh Hoa province, heavy rains from November 16 to the morning of November 19 have triggered landslides and washed away parts of the railway foundation, resulting in multiple service cancellations.

Severe floods have disruptted North – South rail services in the south-central region. (Illustrative photo: thuonghieucongluan.com.vn)
Severe floods have disruptted North – South rail services in the south-central region. (Illustrative photo: thuonghieucongluan.com.vn)

Hanoi (VNA) – Four North – South Thong Nhat passenger trains were suspended on November 19 due to severe flooding in the south-central region, particularly along the section from Nha Trang Station to Dieu Tri Station.

The suspended services include SE7 departing from Hanoi Station, SE6 from Saigon, and SE21/SE22 from Da Nang/Saigon.

Earlier, on November 17–18, the Railway Transport JSC had already halted six passenger trains (SNT1 on November 17; SE8, SE5, SE21/22 and SE6 on November 18).

As of 9 a.m. on November 19, a total of 10 passenger trains had been suspended.

crop.jpg
A section of the railway running through Nam Cam Ranh commune is submerged and obstructed by soil and rocks spilling onto the tracks. (Photo published by VNA)

In Khanh Hoa province, heavy rains from November 16 to the morning of November 19 have triggered landslides and washed away parts of the railway foundation, resulting in multiple service cancellations.

The downpours also flooded several national and provincial roads across the province. While road transport remains largely uninterrupted, authorities are urging motorists to exercise caution in deeply inundated sections of National Highway 1.

On the Khanh Le and Khanh Son mountain passes, forces are continuing efforts to clear blocked routes and search for missing persons. However, adverse weather conditions are hindering rescue and recovery operations.

Initial estimates by local authorities show that heavy rains have caused extensive transport disruptions and landslides across the province, with damage amounting to about 80 billion VND (3.03 million USD)./.

VNA

See more

A working session at the job fair (Photo: VNA)

Vietnamese students flock to Seoul Job Fair 2026

The second annual Job Fair 2026 was held for Vietnamese students in the Republic of Korea. Organisers pitched it as a straight-up bridge between eager students and bosses hungry for young talent who can actually handle multicultural workplaces.

Defendants at the court (Photo: VNA)

Ho Chi Minh City court opens trial over Agribank lending scandal

The investigation revealed that multiple credit files were incomplete or riddled with inaccurate information, while some pledged assets lacked proper legal standing yet were accepted and grossly overvalued. As a result, the loans became high-risk and largely unrecoverable, leading to losses surpassing 1 trillion VND.

Hanoi introduces 53 electric buses from April 18 (Photo: VNA)

Hanoi to add 53 electric buses from April 18

According to the plan, all buses operating within Ring Road 1 will use green energy by July 1, 2026. The requirement will expand to Ring Road 2 by January 1, 2028, and to Ring Road 3 by 2030.

Illustrative image (Photo: VNA)

National, local traffic safety committees to be dissolved from June 1

Under the dicision, ministries and ministerial-level agencies will assume responsibility for tasks previously performed by the committee, in line with their mandates under the Law on Government Organisation, the Law on Road Traffic Order and Safety, the Law on Roads and other relevant legal frameworks, ensuring that traffic safety and order are maintained without disrupiton.

Visitors explore technology showcases at the exhibition held during the Da Nang Startup and Innovation Festival (SURF 2025). (Photo: VNA)

About 10,000 students expected at National Startup Day 2026

This year marks the rollout of the “Student Startup Support Programme for 2026 – 2035”, approved under Decision No. 336/QD-TTg, which places emphasis on practical outcomes, real products, real testing, real partnerships, and measurable impact.

Hong Quang High School pilots teaching mathematics in English starting from the 2025–2026 academic year. (Photo: VNA)

National foreign language proficiency framework issued

The circular establishes a unified benchmark for foreign language proficiency across the national education system, providing a foundation for curriculum design, teaching, testing, assessment, and certification. It is expected to help learners better map out their language development pathways while enabling educational institutions to improve training quality and strengthen articulation between different levels of education.