HCMC reduces dependence on private transport infrastructure investors

HCM City to reduce dependence on private investors for transport infrastructure

Ho Chi Minh City has decided to convert a number of private transport infrastructure projects that were designated as BOT (build – operate – transfer) and BT (Built – Transfer) into public projects.
HCM City to reduce dependence on private investors for transport infrastructure ảnh 1Construction of HCM City’s Ringroad No 2 in Thủ Đức District (Source: VNA)

HCM City (VNS/VNA) – Ho Chi Minh City has decided to convert anumber of private transport infrastructure projects that were designated as BOT(build – operate – transfer) and BT (Built – Transfer) into publicprojects.

Tran Quang Lam, director ofthe Department of Transport, said the city has found it difficult to attractinvestment in transport infrastructure, especially ring roads,national highways and roads in inner districts.

These include the 64km, six-lane ring road No2, whose last 11km stretch is scheduled to be completed in 2022.

According to the department, land compensation for the sections (of ring roadNo 2) from Phu Huu Bridge to Hanoi

Highway and from Binh Thai Intersectionto Pham Van Dong Highway is estimated at 5.1 trillion VND (221.8 million USD)and construction costs at 2.7 trillion VND (117.4 million USD).

The department has suggested convertingthis BOT project into a public project, and Lam said this, if approved bythe city People’s Council, would help complete the ring road in 2022.

The department has also asked forsimilarly converting works to upgrade and widen national highways No 1A,13, 22, and 50.

Nguyen Thanh Phong, Chairman of the municipal People’s Committee, has green-lighted the proposal for the completionof ring road No 2 and instructed related departments and agencies to go aheadwith the plan to convert BOT and BT projects to public projects.

He said by June the transportdepartment has to complete the procedures for publicinvestment in stages 1 and 2 of ring road No 2.

Its sub-project related topaying compensation for affected households should be undertakenusing public funds while the sub-project related to its construction willbe undertaken in public-private-partnership (PPP) form, he said.

The city has many infrastructure worksand so relevant agencies should give priority to urgent ones which wouldhelp resolve traffic problems.

Each project should be carefullyconsidered to identify suitable investment forms and construction schedules, hesaid.

Departments and agenciesshould consider ways to exploit lands along the urban railwaynetwork, expressways and ring roads, he said.

The effort must be led by thedepartments who would collaborate with district-level agencies, he said.The plans for exploiting the lands must be reported to the People'sCommittee by the end of the third quarter this year, he added. – VNS/VNA
VNA

See more

Elderly people take part in activities at a daytime care centre for senior citizens. (Photo: VNA)

Making breakthroughs via policies for older persons

The Politburo’s Resolution No. 72-NQ/TW on groundbreaking solutions to strengthen the protection, care and improvement of public health sets the target of raising average life expectancy to 75.5 years by 2030, with at least 68 years lived in good health.

One of the first-prize winning entries in the “Social housing prototype design ideas – Towards sustainable solutions” contest. (Photo courtesy of the organising board)

Highly applicable social housing design ideas honoured

According to the organising board, the award-winning entries will provide an important foundation for the Ministry of Construction to continue research and develop prototype and typical designs for broad use in localities.

Trinh Quoc Phu (centre) voluntarily hands over a rare forest night heron to the police and authorities of Quy Nhon Nam ward. (Photo: baogialai.com.vn)

Gia Lai rangers receive rare forest night heron

The handover reflects the growing awareness and sense of responsibility among local residents in protecting wildlife, contributing to law compliance and biodiversity conservation efforts in the area.

Hue officers, soldiers and local residents in the central city of Hue are working at full speed to complete solid new homes for natural disaster-hit families (Photo: VNA)

Swift campaign brings Tet homes to storm-hit residents in Hue

Quang Trung Campaign is not merely a task, but a political responsibility and a heartfelt commitment to the people. The guiding principle is to act as swiftly and decisively as possible, ensuring no family is left without shelter, especially in the days leading up to Tet, said Major General Nguyen Thanh Tuan, Director of the Hue Department of Public Security.

Fishermen in the Dong Tac fishery port of Phu Yen ward, Dak Lak province, prepare for a new trip after storm. (Photo: VNA)

Dak Lak supports fishermen in occupational transition

As of December 5, 2025, Dak Lak had 2,556 fishing vessels, with an annual marine catch of around 68,000 tonnes. An estimated 2,900 workers are in need of occupational transition, as most have limited educational backgrounds, unstable incomes and are increasingly ageing.