Work starts on Gia Binh Airport – Hanoi connecting road

Once completed, the project will serve as a vital transport artery at the northeastern gateway of the capital, forming the shortest and most modern route connecting Gia Binh Airport to central Hanoi.

Delegates press the button to officially launch the project. (Photo: Sun Group)
Delegates press the button to officially launch the project. (Photo: Sun Group)

Hanoi (VNA) – The Hanoi People’s Committee, in coordination with Sun Group, officially broke ground on a road project connecting Gia Binh Airport with the capital city of Hanoi on December 19.

The route spans 13.55 kilometres, with a total investment of approximately 1.25 billion USD.

Launched amid a nationwide wave of inaugurations and groundbreakings for 234 projects commemorating the 79th anniversary of the National Resistance Day and welcoming the 14th National Congress of the Communist Party of Vietnam, the Gia Binh Airport – Hanoi connecting road project includes 7 kilometres of newly constructed roadway and 6.55 kilometres running concurrently with existing expressways, which will be upgraded and expanded to a width of 120 metres. The total land-use area is approximately 289.87 hectares.

The project comprises several key components. The newly built 7-kilometre section, with a width of 120 metres, begins at the boundary connecting to Bac Ninh province and ends at the interchange linking the Hanoi – Lang Son Expressway with the Hanoi – Thai Nguyen Expressway/Ring Road 3. The upgraded 6.55-kilometre section runs along the Hanoi – Thai Nguyen Expressway/Ring Road 3, connecting from the first section to the Tu Lien Bridge access interchange. The route passes through Thuan An, Phu Dong, Thu Lam and Dong Anh (Hanoi), as well as Tu Son and Phu Khe wards in Bac Ninh province.

8.png
A graphic image of the Gia Binh Airport–Hanoi connecting road. (Photo: Sun Group)

In addition, the project will include the construction of two direct ramp connections from the Hanoi – Thai Nguyen Expressway/Ring Road 3 to the Tu Lien Bridge access road. Each ramp will feature three lanes, a width of 14 metres and a length of 2.5 kilometres, facilitating direct connectivity between Gia Binh Airport and Tu Lien Bridge.

The project is being implemented under a public – private partnership (PPP) model by a consortium comprising the Cong Thanh Transport Construction and Investment Joint Stock Company and Cat Ba Sun Limited Liability Company, a member of Sun Group.

Truong Viet Dung, Vice Chairman of the Hanoi People’s Committee, delivers remarks at the ceremony. (Photo: Sun Group)

Truong Viet Dung, Vice Chairman of the Hanoi People’s Committee, delivers remarks at the ceremony. (Photo: Sun Group)

Alongside the section within Hanoi, the segment passing through Bac Ninh province is also being developed under the PPP model. This section has a main alignment length of approximately 27.766 kilometres. The main roadway is designed to expressway standards with 10 motorised lanes and a design speed of 120 km/h. Parallel service roads running along both sides of the main route will feature four lanes with a maximum design speed of 80 km/h. The preliminary investment for this section is estimated at approximately 2 billion USD.

The project is currently completing legal procedures to enable early implementation. The Bac Ninh provincial People’s Committee has assigned the consortium of the Cong Thanh Transport Construction and Investment Joint Stock Company and Cam Pha Sun Limited Liability Company, a Sun Group affiliate, to prepare the project’s feasibility study report.

Nguyen Quang Huy, Chairman of Sun Group Northern Region, speaks at the event. (Photo: Sun Group)

Nguyen Quang Huy, Chairman of Sun Group Northern Region, speaks at the event. (Photo: Sun Group)

Once completed, the entire Gia Binh Airport – Hanoi connecting road is expected to reach a total length of approximately 41.316 kilometres, with a combined investment of around 3.16 billion USD. The project will serve as a vital transport artery at the northeastern gateway of the capital, forming the shortest and most modern route connecting Gia Binh Airport to central Hanoi. It will contribute to completing Hanoi’s external transport infrastructure network, easing pressure on Noi Bai International Airport, and opening up new socio-economic development space for the capital’s gateway area.

From this point, a new strategic transport axis is taking shape, linking the country’s political and administrative centre with the culturally rich Kinh Bac region. Along both sides of the corridor, modern urban developments with integrated ecosystems are expected to emerge, alongside the formation of smart logistics hubs, creating momentum for socio-economic growth across the region.

The project contributes to completing Hanoi’s external transport infrastructure network and strengthening regional connectivity with Bac Ninh and other northern provinces. (Photo: Sun Group)

The project contributes to completing Hanoi’s external transport infrastructure network and strengthening regional connectivity with Bac Ninh and other northern provinces. (Photo: Sun Group)

The commencement of work on the Gia Binh Airport – Hanoi connecting road marks the initial step in the strategy to develop a second airport gateway linking the capital to its core urban centre, creating new growth momentum for the Red River Delta. The route is expected to become a symbolic representation of a modern and forward-looking Vietnam, ready to welcome international partners and visitors.

Speaking at the event, Nguyen Quang Huy, Chairman of Sun Group Northern Region, emphasised: “The road connecting Gia Binh Airport with the capital city of Hanoi has been studied and implemented with a long-term vision, opening up new development space for the region. Sun Group is committed to mobilising maximum resources and adopting advanced design, technical and construction solutions to ensure progress, quality, safety and investment efficiency for the project.”/.

VNA

See more

Delegates and students pose for a commemorative photo. (Photo: baocantho.com.vn)

Four more Can Tho schools earn French education accreditation

The recognition of six schools under the Label FrancEducation programme is expected to create momentum for expanding education cooperation between French and Can Tho institutions, contributing to human resources development and friendship between the two countries.

A seminar at the programme (Photo: VNA)

Event promotes inclusion, empowerment for youth with disabilities

A key feature of the programme will be the dialogue “The Inspirers – Family Support on the Journey of Resilience”, where exemplary families and inspirational figures will share stories of overcoming adversity and spread messages of compassion, understanding and community responsibility in building an inclusive and humane society.

UN Resident Coordinator in Vietnam Pauline Tamesis (Photo: VNA)

South–South cooperation promotes rights, justice for women and girls

UN Resident Coordinator in Vietnam Pauline Tamesis commended Vietnam’s sustained commitment to gender equality, noting advances in budgeting, land use, social insurance and domestic violence prevention under the recent review of the Convention on the Elimination of All Forms of Discrimination against Women (CEDAW).

Party General Secretary To Lam presents Nhan Dan newspaper with the first-class Labour Order on March 11. (Photo: VNA)

Nhan Dan newspaper must act as ideological vanguard, shield, information sensor: Party chief

In a keynote address at a ceremony in Hanoi marking the 75th anniversary of the newspaper’s first issue on March 11, General Secretary Lam highlighted its more than seven decades of evolution while maintaining its role as the Party’s sharp ideological weapon, an effective information and communication channel for Party committees and authorities at all levels, and a trusted platform for Party members and people.

A poster celebrating the Election Day (Photo: VNA)

Final preparations underway for Election Day

In Hanoi, local authorities have increased the dissemination of election-related information through community loudspeaker systems, information boards, official websites and verified social media pages, helping officials, Party members and residents better understand their rights and responsibilities as voters.

NA Chairman Tran Thanh Man inspects a constituency in Dong Nai province. (Photo: VNA)

Dong Nai works to ensure workers cast vote on Election Day

With the utmost regard for citizens’ electoral rights and responsibilities, and in a spirit of creating optimal conditions for workers, especially those employed in industrial parks and non-state enterprises, the provincial leader has requested that no overtime be scheduled during voting hours.

Zambia's Minister of Agriculture Reuben Mtolo Phiri (first, left), learns about the OM19 rice variety grown at Tien Thuan cooperative in Thanh Quoi commune,, Can Tho city (Photo: VNA)

Can Tho shares agricultural transformation experience with Zambia

Rice production remains Can Tho’s key industry. Alongside maintaining production, Can Tho has encouraged value chain linkages among farmers, cooperatives and businesses, while accelerating the application of science and technology, mechanisation and digital transformation in farming.

Staff members of the Hanoi Public Administrative Service Centre handle administrative procedures for local residents. (Photo: VNA)

Hanoi: 95% of administrative procedures to be handled from home

The plan targets that at least 80% of administrative procedures under the city’s authority will be provided as fully online public services, while more than 95% of applications will be received and processed entirely online. By June 30, 2026, about 80% of administrative procedures are expected to be restructured based on integrated data systems, with the figure rising to 95% by the end of the year.