Accordingto the management board, the locality is home to nine IPs, six of whichhave concentrated waste water treatment plants.
In order to meet the increasing demand of waste water treatment in thePhu Tai and Long Minh IPs, local authorities invested over 33.1 billionVND (1.52 million USD) in building a modern treatment plant with acapacity of 2,000 cubic metres per day for the two IPs.
Currently, as many as 110 enterprises operating the parks have their waste water treatment systems connected to the plant.
Asimilar facility with a first-phase capacity of 500 cubic metres perday was also constructed in the Nhon Hoa IP with a total investment ofover 12.4 billion VND. It became operational in July 2014 with 25 out of26 enterprises in the park connecting to the plant.
In the Nhon Hoi IP, the first phase’s construction of a 2,000 cubicmetre-capacity waste water treatment plant has been completed, expectedto attract investors in the park.
Land clearance work for waste water treatment projects is also being conducted in the Cat Trinh and Hoa Hoi IPs.
Thefacilities not only create favourable conditions for enterprises toeffectively and sustainably operate in the locality, but also bringbetter sanitary conditions to locals.-VNA