Hanoi’s 340km-long Ring Road 5 to pass through 7 localities, worth 10 billion USD

Hanoi's Ring Road 4 will stretch about 340km through seven northern localities: Hanoi (51km), Ninh Binh (36km), Hung Yen (27km), Hai Phong (63km), Bac Ninh (49km), Thai Nguyen (36km), and Phu Tho (78km).

Thang Long Boulevard in Hanoi (Photo: Internet)
Thang Long Boulevard in Hanoi (Photo: Internet)

Hanoi (VNS/VNA) - Ring Road 5 around the Capital Region has been identified as a national priority project, with authorities aiming to begin development during the 2026–30 period to strengthen regional transport links and support economic growth in northern Vietnam.

The designation was confirmed in a pre-feasibility report prepared by the Thang Long Project Management Board and the Highway Engineering Consultant Joint Stock Company (HECO).

Under the Action Programme implementing the Resolution of the 14th National Party Congress, Ring Road 5 has been classified as a key infrastructure project for the 2026–30 period.

The National Master Plan for 2021–30, with a vision to 2050, and the Road Network Master Plan for the same period, also identify the route as a project scheduled for investment before 2030.

Authorities said the project is intended to meet rising transport demand in one of the country’s fastest-growing economic regions, while improving links and synchronising transport infrastructure between Hanoi and provinces in the northern key economic zone.

The road is also expected to increase transport capacity and support wider socio-economic development across the region.

According to the consultants’ proposal, the route will begin at Km0, corresponding to Km367+100 on Ho Chi Minh Road in Yen Bai commune in Hanoi, and end at the same point, creating a closed loop.

The planned route will stretch about 340km through seven northern localities: Hanoi (51km), Ninh Binh (36km), Hung Yen (27km), Hai Phong (63km), Bac Ninh (49km), Thai Nguyen (36km), and Phu Tho (78km).

Under the proposal, the main expressway will have six lanes in line with the approved master plan, except for the section through Thai Nguyen from Km248+124 to the CT.07 Expressway, which is planned with four lanes. The road will have a design speed of 100-120kph.

Local authorities are also expected to plan parallel service roads, green belts and pavements alongside the expressway.

The minimum cross-sectional width, including the expressway, parallel roads and green belts, is projected at 120m.

Based on the proposed scale, the preliminary total investment is estimated at 265.5 trillion VND (more than 10 billion USD), including roughly 81.3 trillion VND (more than 3 billion USD) for land clearance and resettlement.

Localities have proposed using a public investment model funded by the central budget to support early and feasible implementation of the project.

According to the report, provincial authorities are facing pressure in balancing budgets as they continue to allocate resources for major centrally backed projects, including land clearance and related infrastructure works.

Units under the Ministry of Construction have asked consultants to further review and update transport demand forecasts, traffic volumes on the main route, at interchanges and on parallel roads to determine the most suitable investment scale.

The ministry also requested additional studies on issues including the transition to green vehicles, climate resilience and flood prevention, as well as toll station and rest area planning to help refine the projected total investment for the route./.

VNA

See more

A performance on The Huc bridge of the temple as part of a nighttime tourism programme to discover the Ngoc Son temple on Hoan Kiem Lake, downtown Hanoi. (Photo: VNA)

Hanoi adopts framework to boost night-time economy development

The resolution encourages a wide range of cultural, artistic and tourism activities, including performances, exhibitions, film screenings, presentations of traditional and intangible cultural heritage, and other programmes held in public spaces, pedestrian streets, heritage sites, theatres, cinemas and cultural venues.

A cargo port in Thiruvananthapuram city, India (Photo: ANI/VNA)

Ample room remains for Vietnam–India logistics cooperation

The GTTCI expert noted that alongside logistics and integrated warehousing, e-commerce is expected to be a particularly high-growth sector in the coming years. He described it as a multi-billion-dollar market with significant untapped opportunities for cooperation between Vietnam and India.

The meeting between Minister of Finance Ngo Van Tuan and Ambassador Julien Guerrier, head of the EU Delegation to Vietnam, on June 15. (Photo: thoibaotaichinhvietnam.vn)

Vietnam, EU enhance cooperation in green finance

Minister of Finance Ngo Van Tuan called on the EU to help facilitate Vietnamese firms' access to green finance, expand technical and financial assistance for green transition, and enhance cooperation in strategic technologies, innovation, digital finance and high-tech human resources development.

An overview of the working session between Deputy Finance Minister Tran Quoc Phuong and Kim Dongil, Director of ADB representing the Republic of Korea, Papua New Guinea, Sri Lanka, Taipei (China), Uzbekistan, Vanuatu and Vietnam. (Photo: Ministry of Finance)

Vietnam, ADB to advance strategic projects with strong economic impact

ADB has identified a pipeline of 27 projects for Vietnam through 2029, with total planned financing of approximately 4.6 billion USD. The projects focus on sectors that are among Vietnam’s priorities, including infrastructure, energy, urban development, agriculture and public sector management.

Illustrative photo (Photo: VNA)

Exports gain momentum from high-tech growth drivers

According to the Ministry of Industry and Trade, Vietnam’s exports reached 215.66 billion USD in the first five months of 2026, up 19.5% year-on-year. Twenty-six export items generated more than 1 billion USD in revenue each, including seven with turnover exceeding 10 billion USD.

Participants in the conference (Photo: VNA)

Vietnam, Tunisia target coffee, olive oil as trade ties deepen

Though geographically distant, the two countries share strategic locations in their respective regions, skilled human resources, and a strong commitment to expanding international trade, which form the bedrock for a lasting and mutually beneficial partnership.

Da Nang People’s Committee Chairman Nguyen Manh Hung (second from left) presents investment policy approval decisions and investment registration certificates for three infrastructure projects in FTZ Zones 2, 3 and 4. (Photo: VNA)

Da Nang promotes investment links for pioneering Free Trade Zone

The conference also highlighted the role of digital technologies in building next-generation FTZs. Proposed solutions included the adoption of artificial intelligence (AI), the Internet of Things (IoT), big data, cloud computing and digital customs systems to improve operational efficiency, streamline logistics, accelerate customs procedures and enhance transparency for investors.

Import and export activities at the Mong Cai border gate. (File photo: VNA)

Vietnam–China crossings see spike in ASEAN fresh produce

Since the start of the summer harvest season, China's two major border gates with Vietnam, Youyi Guan in Pingxiang and Beilun 2 Bridge in Dongxing, have entered their peak period for handling imports of fresh agricultural and seafood products from member states of the Association of Southeast Asian Nations (ASEAN).